Shopfitting Projects

 

Movie Mix Client: Mailboxes Etcetera Date: October 2008 Location: Mill Hill
    Premises: Mailbox Rental Fitting time: 2 days
Within 14 days of first contact with us the shopfit for Mailboxes Etc has been fully completed. From the initial site visit and quick quote turnaround our team of four men took just two days to totally refit the premises. 38 panels of slatwall have been installed along with Tegometall uprights and several island gondola units. The job also consisted of installing extra spot lights into the window, adjusting the existing counter, removing the low level studwall and remounting existing cupboards in the back area of the store. The owner of the shop is so pleased with his new store he has already recommended us to head office.
full retail design
Movie Mix Client: Moulton College Pet Centre Date: October 2008 Location: Northampton
    Premises: Pet and Garden Fitting time: 2 days
During October we installed a set of Tegometall bays with slatwall back panels into the newly built Moulton College Garden and Pet Centre. We also designed and built several island counter units to compliment the stores image and supplied many different sizes of slatwall glass shelving. Due to the nature of the wooden building nothing could be screwed to the walls, this is where Tegometall comes into its own as it is used freestanding but still keeps the versatility of slatwall.
full retail design
Movie Mix Client: Cash Convertors Date: October 2008 Location: Grays
    Premises: Pawn Brokers Fitting time: 3 days
The Cash Convertors in Grays, Essex, refit consisted of ripping out the contents of the existing shop before installing slatwall, Tegometall and several glazed showcase units. The 3 day shopfit also included the manufacture and install of a new counter unit and a laying a new floor.
full retail design
Movie Mix Client: Assembly of God Date: September 2008 Location: London
    Premises: Bookshop Fitting time: 2 days
During a busy month we fitted out a new Christian bookshop in London. The complete fit-out consisted of installing maple slatwall panels throught the store and supplying a combination of both glass and wooden cabinets. The shopfit took 2 days to complete and transformed a bare carcass of a room into a fully fitted retail bookstore.
full retail design
Banks of York Client: Banks of York Date: August 2008 Location: York
    Premises: Music Store Fitting time: 4 weeks
Our most expansive project to date was undertaken at Banks of York, the countries largest sheet music and instrument store. The 3 floor shopfit took around 4 months of planning and CAD to ensure the desired result was achieved at miniumum disruption to the store which needed to keep trading during the install. Over 4500 sq ft across the 3 floors was completely renovated including flooring, ceiling, electrics, stairwells and rails.
full retail design
Movie Mix Client: Movie Mix Date: July 2008 Location: Ilfracombe
    Premises: DVD Rental Fitting time: 1 week
The beginning of July saw us complete another week long shop fit, this time it was a DVD and movie store based in Ilfracombe North Devon. International Displays completely gutted the existing store and laid new flooring, installed a new ceiling and re wired the electrics. The main transformation was acheived by installing slatwall around the whole of the store in an eyecatching white and red colour scheme.
full retail design
Smiling Grape Client: The Smiling Grape Date: June 2008 Location: St. Neots
    Premises: Wine Shop Fitting time: 2 weeks
A new local company, The Smiling Grape Company, opened their first retail wine shop in St.Neots, Cambridgeshire.
International Displays won the contract to refit the grade 2 listed building from top to bottom including a full re wire, new floor, external and internal signage and a range of bespoke oak units finished off with a 1800mm square wall mural of a vineyard in Spain. The job was completed over a 2 week period.
full retail design
Music Room Norwich Client: Music Room Date: May 2008 Location: Norwich
    Premises: Music Shop Fitting time: 2 days
New slatwall and several vinyl, and sheet music browsers were installed in the Music Room in a 48 hour shopfit. 2 teams of men worked non stop to ensure minimum downtime to the music retailers business. This is one of many stores we have re-fitted for the Music Room around the UK. The colour scheme on this shopfit centered around maple and aluminium and the browsers were fitted to enable maximum display of music books and ability to display items through the window.
full retail design
CAD retail design Client: Atlantis Caps Date: May 2008 Location: London
    Premises: Clothes Shop Fitting time: 8 hours
One of International Displays' smaller refits brought a fair few challenges. A 3 metre x 2 metre mezzanine floor on Oxford Street London was slatwall clad and bespoke cupboards and mirrors were added to give a stylish finish to a baseball cap concession. The shop was finished in 8 hours despite massive parking and access restrictions.
full retail design
CAD retail design Client: Nite Out Date: April 2008 Location: Aberdeen
    Premises: Party Shop Fitting time: 4 days
Successful adult chain Nightlife recently opened their first party accessories store in Aberdeen. The Nite Out shop was a 4 day fit out by International Displays which included the laying of a new oak laminate floor, electrical and plumbing work, external signage and all internal fixtures and fittings. The job also entailed installing 25 sheets of slatwall with aluminium inserts and a new counter matching the shops colour scheme.
full retail design
CAD retail design Client: Jaysons Date: March 2008 Location: Birmingham
    Premises: Music Shop Fitting time: 5 days
In March, Jaysons store in Birmingham knocked through into a back room and doubled the size of his retail space. International Displays won the contract to refit the newly sized store using 62 sheets of white slatwall with inserts. We also installed Tegometall bays, 11 bespoke glass cabinets, over 100 multimedia shelves and a 14 metre glass and aluminium counter. The fit was completed over 5 days and the store re-opened within 2 weeks.
full retail design
CAD retail design Client: Hawleys Date: March 2008 Location: Dartford
    Premises: Garden Centre Fitting time: 4 days
We completed the refit and refurbishment of three sections of the Hawley Garden Centre in Dartford. The project consisted of renovating the gift, stationary and store room sections by installing slatwall to all areas. This was a particularly complicated job due to the nature of the glass buildings used in garden centres, so a lot of stud work had to be carried out prior to the installation of the slatwall.
full retail design
CAD retail design Client: Frosts Date: September 2007 Location: Frilford
    Premises: Garden Centre Fitting time: 2 days

The beginning of this month saw another Frost's Garden Centre shop fit completed, this time it was their Millets Farm outlet. The 2800 sq ft installation consisted of 41 slatwall and tegometall gondola's, as well as over 40 slatwall and windows units. The installation was completed in just 2 days, thus minimizing disruption to their existing trade.

full retail design
CAD retail design Client: PMS International Date: June 2007 Location: Basildon
    Premises: Toys and Gifts Fitting time: 15 days

This month we undertook one of our largest projects to date with the fitting of the new showroom at PMS International. The 12,500 sq ft showroom had over 700 panels of slatwall fitted and a huge range of gondola units manufactured and installed.

full retail design
CAD retail design Client: Music Room Date: May 2007 Location: Salisbury
    Premises: Music Shop Fitting time: 10 days

May was another busy month for International Displays with several shopfittings taking place. The Music Room in Salisbury had a complete re-fit and we undertook the whole project from start to finish which included designing and installing the custom built displays, furniture and browsers as well as all the lighting and counters.